projects
projects
100MWp (AC) Dynamic Sun Energy Pvt Ltd, Pabna, Bangladesh (EPC Contractor)
Scope of work: SPC Pile Drive,MMS Structure,SCB installation, DC Cable laying, SCB& Inverter Termination, MC4 Connection, Earthing, LPS,AC cable Laying and Termination, Transformer to RMU connection and control room switchgear termination, communication cable laying and termination with interfacing the SCADA system.
200MWp (AC) Tista Solar Power Ltd(Beximco), Sundarganj, Gaibandha (Sub-contractor of Rays Infrastructure. India)
Scope of work: SCB installation, DC Cable laying, SCB& Inverter Termination, MC4 Connection, Earthing, LPS,AC cable Laying and Termination, Transformer to RMU connection and control room switchgear termination, communication cable laying and termination with interfacing the SCADA system.
100MWp(AC) Solar Power plant ERBL(Orion), Mongla Bagherhat under (Sub-contractor of ABB pte Ltd. Singapore)
Scope of work: SCB installation, DC Cable laying, SCB& Inverter Termination, MC4 Connection, Earthing, LPS,AC cable Laying and Termination, Transformer to RMU connection and control room switchgear termination, communication cable laying and termination with interfacing the SCADA system, GIS installation and testing commissions at Mongla 132 KV grid connection at PGCB End.
30MWp Solar Power plant ISPL (INTRACO-PARAMOUNT), Kaliganj,Lalmonirhat(EPC Contractor)
Scope of work: Spc Pile Drive,PV panel,Module Stucture,SCB installation, DC Cable laying, SCB& Inverter Termination, MC4 Connection, Earthing, LPS,AC cable Laying and Termination, Transformer to RMU connection and control room switchgear termination, communication cable laying and termination with interfacing the SCADA system, GIS installation and testing commissions at Mongla 33 KV grid connection at PGCB End.
7.6MW Solar Power plant NWPGCL
Scope of work: PV panel,Module Stucture SCB installation, DC Cable laying, SCB& Inverter Termination, MC4 Conneciton, Earthing,AC cable Laying and Termination, Transformer to RMU connection and control room switchgear termination, communication cable laying and termination with interfacing the SCADA system, 33 kV outdoor bus way erection and testing and connection at NESCO line.
35MWp (AC) Solar Power plant at Manikganj
Scope of work: PV panel,Module Stucture SCB installation, DC Cable laying, SCB&Inverter Termination, MC4 Connection, Earthing, LPS,AC cable Laying and Termination, Transformer to RMU connection and control room switchgear termination, communication cable laying and termination with interfacing the SCADA system.
50 MWp(AC) Solar Power plant Mymenshing
Scope of work: PV panel,Module Stucture, SCB installation, DC Cable laying, SCB& InverterTermination, MC4 Conneciton, Earthing, AC cable Laying and Termination, Transformer to RMU connection and control room switchgear termination, communication cable laying and termination with interfacing the SCADA system.
10.3 MWp(AC)Solar Power plant Sympa Solar
Scope of work: SCB installation, DC Cable laying, SCB& InverterTermination,MC4 Conneciton,Earthing,AC cable Laying and Termination,Transforemer to RMU connection and control room switchgear termination, communication cable laying and termination with interfacing the Scada system.33 KV outdoor bus way erection and testing and connection at NESCO line.
2.8 MWp(AC)Roof Top Solar Power plant at AKH Knit Wear Ltd
Scope of work: Mounting Structure,Module,Inverter installation, DC Cable laying, SCB& InverterTermination, MC4 Conneciton, Earthing, AC cable Laying and Termination, switchgear termination, communication cable laying and termination with interfacing the Scada system.
2.4 MWp(AC)Roof Top Solar Power plant at Janata Jute Mil Ltd
Scope of work: Mounting Structure,Module,Inverter installation, DC Cable laying, SCB& InverterTermination, MC4 Conneciton, Earthing, AC cable Laying and Termination, switchgear termination, communication cable laying and termination with interfacing the Scada system.
743 KWp(AC)Roof Top Solar Power Dutch Bangla Pac
Scope of work: Mounting Structure,Module,Inverter installation, DC Cable laying, SCB& InverterTermination, MC4 Conneciton, Earthing, AC cable Laying and Termination, switchgear termination, communication cable laying and termination with interfacing the Scada system.
350 KWp(AC)Roof Top Solar Power Pledge Harber International School
Scope of work: Mounting Structure,Module,Inverter installation, DC Cable laying, SCB& InverterTermination, MC4 Conneciton, Earthing,AC cable Laying and Termination, switchgear termination, communication cable laying and termination with interfacing the Scada system.
250 KWp(AC)Roof Top Solar Power Eco Fab RMG Factory
Scope of work: Mounting Structure,Module,Inverter installation, DC Cable laying, SCB& InverterTermination, MC4 Conneciton,Earthing, AC cable Laying and Termination, switchgear termination, communication cable laying and termination with interfacing the Scada system.